One property also added a cool fountain to their bed- check out the progression!
This is what it looked like before any work began.
This was the first part of putting down concrete into 2 portions- one for the fountain and the other to the flower bed.
This was the final product! After the concrete work, they worked on electricity to get the fountain going, set the fountain portion in, then finish with planting, irrigation to water everything, and mulch as a final touch. Doesn’t it look so good?!